STRATEGIC CONSULTING

CONCEPT DEVELOPMENT

DESIGN DEVELOPMENT

PRODUCT DEVELOPMENT

LIGHTING CALCULATIONS

BIM PROJECT (REVIT)

BUDGET ESTIMATE

COMMISSIONING

Why should you hire an independent lighting designer?

Our task is to bridge the gap between the aesthetic and technical aspects of lighting to create a lighting solution that integrates as well with the architecture as it does with engineering services.
Since we are not subject to a brand we can provide the best possible technical solution in the client's budget. As in another profession the project has a cost but it can be recovered through the lifespan costs of the building.
Aesthetic. Use light as building material that generates shapes and notions of space.

Energy savings.
 If you have a well planned lighting installation you can have a significant amounts of energy saved.

Increases sales.
Light can attract customers focus and highlight the products and can be a brand tool for the label. Which eventually can have a positive effect on your sales.

Reduced maintenance. Optimized solutions.

Improving productivity. The right light for the right task. By reducing stress and increasing visual comfort. In the past years there are plenty of world wide research performed about the effect of light on stress, and circadian cycles that control alertness and rest.

Independence. We offer impartial advice.

Our process


Preparation

Analysis of Client’s requirements
Review of Architect’s / Interior Designer’s plans
Review of space and site constraints
Confirmation of Lighting Brief

Design

Concept
Production of Lighting Concept 
Visual representations and sketches to show design intent
Lighting inspiration with draft selection of luminaires types
Preliminary meeting with Client and/or Design Team

Design Development
Preliminary lighting plans
Preliminary luminaires schedule Preliminary elevations and details Preliminary budget estimate
Meetings with Client and/or Design Team

Technical Design
Final lighting plans
Final luminaires schedule
Fully coordinated design details
Control schedules and schematics
Consolidated budget estimate
Coordination meetings with Client and/or Design Team 

Construction

Initial briefing of Contractor
Site meetings and inspections
Revisions to lighting scheme 

Use

Final inspection and snagging
Aiming and focussing of directional luminaires
Giving guidance on scene settings during lighting control programming
General testing of operation 
We work to the standards of conduct set out by the RIBA and IALD. Our project stages allows us to integrate easily with the RIBA architectural stages and also gives the opportunity to review the project with the client and design team at each stage to ensure the best outcome for the client.